Marin fee waivers expire Dec 31, 2026 Two detached ADUs per lot from Jan 1, 2027 Check your lot before both clocks run

ADUs in the Sunset District: What Fits a 25-Foot Lot

The Sunset does not build backyard cottages first. On its 25-foot lots, the ADU is carved out of the ground floor you already have — and San Francisco's own permit data for District 4 proves the pattern, permit by permit.

The short answer

55 ADU permits in District 4 since 2023 — and the conversion is the story

SF open permit data (DBI via DataSF) records 55 distinct ADU-flagged permits filed in District 4, 2023–2026 — every one of them inside DBI's “Sunset/Parkside” analysis neighbourhood. District 4 ranks #3 of San Francisco's 11 districts for ADU filings in the period (55 of 469 citywide). 38 of the 55 have been issued.

Of the 22 District 4 permits whose descriptions state a type, 18 are interior or garage conversions and only 3 are detached new construction. On a 25-foot Sunset lot, start with the garage-and-storage level — then read the rent-control guide before you touch space your tenants use.

Method: DataSF dataset i98e-djp9 (DBI Building Permits), DBI's own ADU flag, filed 2023-01-01 to the Nov 2026 pull, deduplicated. Declared (estimated) cost is an applicant estimate recorded at filing — not a final construction cost. SF publishes no per-permit fees in open data, and no fee claims are drawn from it. District typology from the ADU Build Works research corpus. Full method note in the permit-evidence section below.

The stock

1940s–60s stucco rows on 25-foot lots

District 4's ADU stock is distinctive: 1940s–60s stucco rows on 25-ft lots — about 2,500 sq ft — with ground-floor garages. That single fact shapes everything. The lot is too narrow for easy side access, the rear yard is shallow, and the convertible volume is not in the garden — it is the garage-and-storage level under the living floors, opening toward the rear.

Inner and Outer Sunset houses share that pattern, which is why the district's permits look the way they do: the work is overwhelmingly alterations to existing buildings, not new structures. Permit types corroborate the type descriptions — 49 of the 55 District 4 permits are additions/alterations/repairs, and only 5 are new construction.

Permit evidence — District 4

What DBI permits actually show for the Sunset

These figures are counted from DBI's own records, not estimated from listings or broker pages. Read the caveats with the numbers — they are part of the evidence.

MeasureDistrict 4 figureNote
ADU-flagged permits filed, 2023–202655All 55 in DBI's Sunset/Parkside neighbourhood; #3 of 11 districts (55 of 469 citywide)
Issued38 of 55Statuses across the 55: 20 complete, 17 issued, 15 still filed, 3 other
Standalone vs mixed39 / 1639 standalone ADU projects; 16 filed as part of larger projects
Standalone declared (estimated) cost — median, all filed$60,000n=39. Applicant estimate at filing — not a final construction cost
Standalone declared (estimated) cost — median, issued subset$75,000n=27. Same caveat: declared estimate, not a construction cost
Filings by year2023: 24 · 2024: 9 · 2025: 15 · 2026: 72026 is a partial year at the pull date, with filing-to-publication lag — do not read it as a trend

Type mix, stated exactly with its limit: of the 22 District 4 permits whose descriptions state a type, 18 are interior or garage conversions and only 3 are detached new construction. The other 33 of the 55 do not state a type in their descriptions, and this page does not guess them.

Mandatory caveats. Declared (estimated) cost is an applicant estimate recorded at filing — not a final construction cost, not a bid, and not a guide to what your conversion will cost. SF publishes no per-permit fees in open data, so this page makes no fee claims from permit data. For conversion method — ceilings, egress, underpinning, fire separation — use the basement and lower-level conversion guide; this page deliberately does not repeat the method.

Five District 4 permits, anonymised

ProjectDeclared (estimated) costFiled → IssuedPermit
Ground-floor garage/storage → 2-bed / 2-bath ADU$285,000Filed Nov 2023, issued Aug 2024202311030160
New 1-storey rear ADU (detached)$250,000Issued Jul 2024202312082245
New 2-storey rear ADU structure$125,000Issued Aug 2024202312011816
Existing first-floor bedroom → ADU conversion$55,000Issued Jun 2024202401264743
Legalisation of an existing ADU$120,000Issued Nov 2024202308255344

Declared (estimated) cost in every row is the applicant estimate recorded at filing — not the final construction cost. The spread itself is the lesson: a bedroom conversion and a full garage-to-two-bed conversion are both “Sunset ADUs” in the data, at very different declared figures, because the starting space and the scope are different.

Reading the record honestly

Standalone, mixed, filed and issued — what the words mean here

Of the 55 District 4 permits, 39 are standalone ADU projects and 16 are mixed with larger projects — filed alongside broader work on the same property rather than as an ADU on its own. Standalone figures are the cleaner read on what a Sunset homeowner's ADU project looks like, which is why the declared-cost medians on this page are given for the standalone set: a median of $60,000 across all 39 filed standalone permits, and $75,000 across the 27 of them that have been issued. Mixed projects carry the cost of the larger work with them, so blending them in would distort the picture in both directions.

The filing pattern by year — 24 filings in 2023, 9 in 2024, 15 in 2025 and 7 in 2026 — needs the same care. The 2026 figure is a partial year at the November 2026 pull date, and filing-to-publication lag means recent filings are the most likely to be undercounted. Read the four years as evidence that District 4 files ADUs steadily, not as a league table of good and bad years, and do not read a trend into a partial year.

Status tells a similar, steadier story: 20 of the 55 are recorded complete and 17 as issued — together, the 38 that have been issued — against 15 still at filed status and 3 in other statuses. A filed permit is a project in the system, not a finished home; an issued or complete one has cleared DBI's process. When you check your own address below, your plan is written for the start of that journey, with the district's real conversion pattern — not a detached-cottage assumption — built into it from the first answer.

District history

The District 4 ADU Incentives Pilot

District 4 has already been a policy focus once. A District 4 ADU Incentives Pilot existed in 2021, run by SF Planning with the District 4 Supervisor's office and ASIAN, Inc., and recorded in Board of Supervisors Resolution 69-22. The pilot is part of why the Sunset has an ADU conversation at all — and why District 4 homeowners should expect their district to stay in the policy spotlight.

One figure needs its label, exactly. A cost band for the pilot is sometimes quoted as $175–250K. That band is press-reported pilot costs (Wind Newspaper, reporting on the pilot) — not an official figure and not permit data. This page does not present it as verified, and you should not budget from it. Budget from your own level's ceiling, egress and structure — the method is in the conversion guide.

Your options on a Sunset lot

Convert first, sell separately if eligible, detached rarely

Sell the unit as a condo — the District 4 push

District 4 is part of San Francisco's AB 1033 conversation: building an ADU and, where the strict eligibility test is met, selling it separately as a condo. The test — programme, application date, lot size, one ADU only, no JADUs — is exact, and no page can promise you pass it. Read the full test on the AB 1033 condo-conversion guide and check your property against it.

Two detached ADUs on a 25-foot lot? Usually no

Honest answer for most Sunset lots: no. Two detached structures, with setbacks, on a 25-ft-wide, roughly 2,500 sq ft lot behind an existing house, does not fit in the ordinary case — which is exactly what the permit record shows, with only 3 detached projects among the 22 type-stated District 4 permits. What changes on Jan 1, 2027, and the lots where two detached can work, are covered on the two-ADUs-2027 guide. In the Sunset, plan on the conversion first.

Rent: read this before you convert a tenant's garage

A Sunset garage is often a tenant's parking or storage — a housing service under the Rent Ordinance. Whether your new unit is rent controlled, and what removing a service can cost you, is decided on the rent-control page. Read it before the design, not after it.

Questions, answered

Sunset ADUs, plainly

What fits on a 25-foot Sunset lot, really?

On the District 4 record, a conversion of the ground-floor garage-and-storage level. Of the 22 District 4 permits whose descriptions state a type, 18 are interior or garage conversions and only 3 are detached new construction. The lot's width and shallow rear yard make the existing level the realistic volume.

How many ADUs has the Sunset actually permitted?

55 distinct ADU-flagged permits were filed in District 4 from 2023 to 2026, all in DBI's Sunset/Parkside neighbourhood, and 38 of the 55 have been issued. District 4 ranks #3 of SF's 11 districts for ADU filings in the period. Source: DataSF dataset i98e-djp9, DBI's ADU flag, Nov 2026 pull, deduplicated.

What does a Sunset ADU cost? The permits say $60,000.

No — $60,000 is the median declared (estimated) cost for standalone District 4 permits (all filed, n=39; $75,000 for the issued subset, n=27). A declared estimate is an applicant estimate recorded at filing, not a final construction cost. Do not budget from it; get your own level assessed.

What was the District 4 incentive pilot?

A District 4 ADU Incentives Pilot existed in 2021 (SF Planning, the District 4 Supervisor's office and ASIAN, Inc.; Board of Supervisors Resolution 69-22). A $175–250K band quoted for it is press-reported pilot costs (Wind Newspaper, reporting on the pilot) — not an official figure and not permit data.

Can I sell my Sunset ADU as a condo?

Possibly, under AB 1033 — if your project meets the full eligibility test. The AB 1033 guide lays out every element; there is no blanket promise of eligibility or approval.

Will two detached ADUs fit on my Sunset lot?

Usually no on a standard 25-ft lot. See the honest lot-fit discussion on the two-ADUs-2027 guide — and note the District 4 record: detached projects are the small minority here.

Check your Sunset address

Your lot, your ground floor, your answer

The checker is pre-set to San Francisco. Tell us your Sunset address and what your ground floor does today — garage, storage, or already living space — and your plan starts from the District 4 pattern: conversion first, services checked, detached only if the lot honestly allows it.

Check my lot

FREE · FAST VERDICT

Step 1 of 2 — your address and one tap on what you want to build. That is enough for a first verdict; sharpen it afterwards only if you want to.

Your address is looked up with the US Census geocoder and FEMA flood maps to find your jurisdiction. Nothing about you is stored unless you choose to store your brief after your verdict. Privacy

Sizes in the fast verdict are rule caps for your town. Tell us your lot size afterwards, in “Sharpen your verdict”, and we'll check what your lot can actually hold.

ADU Build Works · Lot planSheet A-1 · Your verdict

Fast verdict — preliminary

Your lot looks workable.

    Confidence: preliminary — inferred from your address and answers, not yet confirmed by a site check or a municipal record pull. Nothing here is a permit approval or a guarantee.

    View rules: The 2027 view re-reads every row under the rules that start Jan 1, 2027 — rows that change are badged.

    Every type, answered — not just the one you picked

    True cost — the planning band, the fees on record, and what the band leaves out

    Not in the band — budget these separately; no honest source lets us put a number on them for your lot, so none is invented:

      How long until someone can move in?

      Dates that change this decision

        What the permit record shows

        What would change this answer

        Lay your quotes side by side

        Print this sheet and write each contractor's figures in a column. Every row is something a comparable bid has to state; a blank in a quote is a question for that contractor, not a saving. The first column is your brief, filled from your answers.

        Line every quote must stateYour briefQuote AQuote BQuote C

        Check each contractor's licence number on the Contractors State License Board's public lookup (cslb.ca.gov) before you compare prices. Figures in your brief are the rule caps and planning estimates shown above, not bids.

        Make your verdict more exact (optional)

        All of these are optional. Answer any you know and your verdict above updates straight away. You can skip every one of them.

        Skip these — save my brief now ↓

        Save your brief

        Your verdict stays on this page either way. To save your brief we need just three things: your name, how to reach you, and your OK. Nothing else is required. You'll see a confirmation here once it is stored.

        Roster status, plainly: our founding roster is enrolling and no contractors are signed yet. Early projects are first in line for matching when seats fill — you may then receive up to 2–3 comparable quotes and choose. No quotes are available today, and we will not pretend otherwise.

        Check my lot — free